Project Name: | Coburn |
---|---|
Location: | Geraldton, WA |
Client: | Strandline Resources |
Capacity: | 33 MW |
Fuel Source: | Hybrid: 18MW Gas, 12MW/11.13MWp Solar, 2MW/1.65MWh BESS |
Project Commencement: | 2022 |
Commodity / Type: | Mineral Sands |
A build-own-operate project, this fully integrated 34MW hybrid power station generates energy for Strandline’s Coburn mineral sands project in WA’s Gascoyne region.
This innovative turn-key solution, which was delivered in partnership with our integrated renewables specialists, Hybrid Systems Australia, comprises 12MW of solar capacity, two 2MW BESS, an 18MW high-efficiency–low-emissions gas generation plant and a 1,100kl LNG storage and regasification facility.
The power station’s solar farm will supply more than 30% of the mine site’s power, helping to reduce fossil-fuel costs and carbon emissions.