Project Name: | Deflector |
---|---|
Location: | Geraldton, WA |
Client: | Silverlake Resources |
Capacity: | 15.5 MW |
Fuel Source: | Gas |
Project Commencement: | 2016 |
Commodity / Type: | Gold |
The Pacific Energy owned Deflector Power Station, near Yalgoo in WA, has been providing power to the Deflector Gold Mine since 2016.
At commencement, Pacific Energy provided a power solution consisting of a 9MW dual fuel powered station (engines featuring our proprietary dual fuel technology, allowing the engines to run on a combination of diesel and gas) mitigating fuel supply interruption risks.
In 2022, the Deflector power station was expanded and converted to run on 100% gas, without the relocation of any existing services, ensuring minimal disruption to our client’s operations.