Project Name: Abra
Project Type: Hybrid / Renewable
Location: Meekathara, WA
Client: Galena Mining
Capacity: 21.4 MW
Fuel Source: Hybrid: 10MW Gas, 7MW Solar, 2MW BESS, 2.4MW Diesel
Project Commencement: 2022
Commodity / Type: Lead - Silver

A 21.4 MW fully integrated hybrid power station that uses thermal and renewable power to generate energy for Galena’s Abra Base Metals Project in WA’s Gascoyne region.

This build-own-operate project was designed and delivered using our in-house capabilities and expertise and comprises a 7MW solar farm, a 2MW BESS, a 10MW high-efficiency–low emissions gas generation plant and a 1,100kl LNG storage and regasification facility.

The solar farm and BESS will meet nearly 30% of the mine site’s power needs, significantly reducing fossil-fuel consumption and emissions.