Project Name: | Abra |
---|---|
Project Type: | Hybrid / Renewable |
Location: | Meekathara, WA |
Client: | Galena Mining |
Capacity: | 21.4 MW |
Fuel Source: | Hybrid: 10MW Gas, 7MW Solar, 2MW BESS, 2.4MW Diesel |
Project Commencement: | 2022 |
Commodity / Type: | Lead - Silver |
A 21.4 MW fully integrated hybrid power station that uses thermal and renewable power to generate energy for Galena’s Abra Base Metals Project in WA’s Gascoyne region.
This build-own-operate project was designed and delivered using our in-house capabilities and expertise and comprises a 7MW solar farm, a 2MW BESS, a 10MW high-efficiency–low emissions gas generation plant and a 1,100kl LNG storage and regasification facility.
The solar farm and BESS will meet nearly 30% of the mine site’s power needs, significantly reducing fossil-fuel consumption and emissions.